Projects

1 – 5 Grosvenor Place, Gantry

Client: Sir Robert McAlpine. A central London flagship development we have been involved with the construction of 120t site accommodation...
Blakes Hotel development in Shoreditch, London N1

Blakes Hotel development in Shoreditch, London N1

Apex have provided the steel frame to accompany and tie into the slip formed main concrete core to create an...

Overnight project at Zara in Bluewater, Kent

Working with RG Group and in keeping with the Zara concept of open plan design and minimal columns within the...

World Business Centre 4, Heathrow Airport

Supply, fabrication and install of 470t structural steel frame on Bath Road next to Heathrow Airport runway 2. Commenced in...

Grosvenor Square Gantry and Tower Crane Grillages

As part of a new landmark Mayfair development, Apex were contracted to supply enable structures in the form of site...

Steel roof frame extension, Notting Hill Gate

Apex have constructed a steel roof frame extension to existing RC frame structure as part of Notting Hill Gate redevelopment....

Old War Offices Whitehall

Apex Steel Structures have recently supplied 4No. temporary tower supports for heavy plant at London’s most prestigious hotel redevelopment at...

Grafton Centre Refurbishment

Apex Steel Structures Ltd are fabricating and installing approximately 100t of refurbishment steelwork at the existing Grafton Centre, Cambridge. Our...

High Holborn

Client: Synergy. Construction of new and existing refurbishment of commercial building on High Holborn, London inclusive of the supply and...
More