Apex: Steel Structures

Infrastructure

Project title

Whitechapel Crossrail

Client

Morgan Sindall

Market sector

Infrastructure

Type

Construction of New Platform 4 from Stub Columns, Beams and Cross Bracings, Lighting Columns carrying Cable Management System (CMS), Stairs and Ramps.

Steel

Approximately 55 tonnes of hot-rolled steelwork – S355 J2H Specification material – Galvanised to 140microns & the supply and installation of composite metal decking.

Engineer

Morgan Sindall Professional Services (MSPS)

Overview

read moreread less

We were pleased to continue our excellent relationship with market leaders Morgan Sindall to construct the new Platform 4 at Whitechapel Station – part of the overall Crossrail regeneration to the station.

Following the existing track setting out, Platform 4 was over 130m and relied upon accurate surveying techniques and precision manufacturing. This project was 100% error free.

 

Our site installation team worked during engineering shifts and weekends to ensure the Station was opened to the public for its critical deadline.