Apex: Steel Structures

Public

Project title

Central Foundation

Client

Bouygues UK Ltd

Market sector

Public

Type

Steel Frame and existing building strengthening

Steel

275 tonnes

Engineer

Terrell

Overview

read moreread less

The steel construction of Central Foundation School project represents the 6th BSF Project Apex were involved with during 2011 & 2012.

Blocks L, B & C total over 275T of steel frame and strengthening to existing floors. Apex also supplied over 1500m2 over metal decking and roof deck.